V1 — A Dispatch, End to End
Brief → launch → isolated worktree → verification → receipt. ~120s.
Written 2026-07-10 — this org moves fast; the sessions are the ground truth
Screen recordings of real tooling. No talking heads. Seven films play here; V4 (Adrian) still holds an honest slot until that film ships.
Brief → launch → isolated worktree → verification → receipt. ~120s.
Three worktrees, three timers; ends on the benchmark table. ~90s.
False clean-commit claim vs empty git log; bounce-back; real commits. ~60s.
Cold visitor opens the chip; gets walked to a real page. ~45s.
Film in production
Gated on the Adrian program. Placeholder lives on /adrian/ until the guide ships.
Shared chip core in both assistants. Geometry that survives a reload. Built and verified, not production-deployed that night.
Multi-page flow resumes across reloads. Scripts live off the local filesystem.
Chip note → database row → build-queue card → fleet console. Nobody transcribed it.
Self-merged unread PR vs the demo film and live page Mike actually reviews. ~60s.
Package demo films also on the session page: /sessions/…/#films
Adrian, the site’s guide, is being built in the open — watch that happen in Sessions.